Friday i was doing 3x bore holes to a manifold chamber + runs back into a house, everything done in 40mm HDPE pipe using Electro-Fusion fittings for the connections for the manifold. Before fitting the Electro-Fusion joints the pipes was scrapped and cleaned as well as making sure the fitting itself was clean including the nipples to connect the fusion welder to. about 40% of the fittings done didnt melt to the pipe or the "nipple" indicatiors didnt rise to show its complete but the fitting was very hot to touch. Each one was done the same yet 40% didnt work.
I flung the non welded fittings away and replaced with another one. Could i of kept trying the failed fitting till it worked? and what are you doing when the pipes have had water in them? still ok to weld or use compressions?
Thanks
I flung the non welded fittings away and replaced with another one. Could i of kept trying the failed fitting till it worked? and what are you doing when the pipes have had water in them? still ok to weld or use compressions?
Thanks