Hi
Received the following email this morning, she's an ex work mate of my partner (so probably expecting the work for peanuts).
The work she wants doing is an existing ensuite shower room - renew tray and enclosure and fit wall panels, renew toilet, currently a low level with cistern boxed in she wants to keep a low level but with cistern not boxed in. Replace big horrible corner unit and basin with slim modern unit and basin. Taps waste etc.
Existing Bathroom out. Low profile tray in with screen/deflector. Wall panels. Replace wc and basin with new close coupled toilet and wall hung basin with 1/2 ped taps waste etc. Extractor to be fitted. Space is limited will be hard with 2 people working.
Downstairs wc. Renew low level wc fit new wall hung basin.
Will be laying hardboard over all the floors and also laying new vinyl flooring. Will also add pvc skirtings to freshen up the rooms. No new rads.
2 of us would be doing it.
The downstairs wc is a day.
Ensuite 2-3 days.
Bathroom 3-4 days..
Said we would also fit any accessories mirrors, cabinets etc. The only thing we wouldn't be doing is decorating because they said they would sort it out. Materials ordered from big merchants not victoria plumb.
Obviously I've allowed a bit on top for the unforseen and a mark up on materials (15%)
Priced it at 9500.
Received the following email this morning, she's an ex work mate of my partner (so probably expecting the work for peanuts).
The work she wants doing is an existing ensuite shower room - renew tray and enclosure and fit wall panels, renew toilet, currently a low level with cistern boxed in she wants to keep a low level but with cistern not boxed in. Replace big horrible corner unit and basin with slim modern unit and basin. Taps waste etc.
Existing Bathroom out. Low profile tray in with screen/deflector. Wall panels. Replace wc and basin with new close coupled toilet and wall hung basin with 1/2 ped taps waste etc. Extractor to be fitted. Space is limited will be hard with 2 people working.
Downstairs wc. Renew low level wc fit new wall hung basin.
Will be laying hardboard over all the floors and also laying new vinyl flooring. Will also add pvc skirtings to freshen up the rooms. No new rads.
2 of us would be doing it.
The downstairs wc is a day.
Ensuite 2-3 days.
Bathroom 3-4 days..
Said we would also fit any accessories mirrors, cabinets etc. The only thing we wouldn't be doing is decorating because they said they would sort it out. Materials ordered from big merchants not victoria plumb.
Obviously I've allowed a bit on top for the unforseen and a mark up on materials (15%)
Priced it at 9500.