plumbdoctor
Hi I am aware we are allowed up to u16 35mm pipe on out qualifications im just being lazy here as I'm out and not got the time or brain power at the moment to work it out, been asked to install a 45kw boiler off a u16 gas meter with 50m gas pipe run ? I'm sure this is commercial scope ? Help would be great.
As 28mm at 30m is 4.8 m3hr
Thanks
As 28mm at 30m is 4.8 m3hr
Thanks