Just finished designing the CH system I spoke about before. The house is 520 square metres of floor space over 4 floors. Total heat loss is pretty much bang on 70KW from calculating it so 2x 35KW boilers. 32 radiators. Just around 500sq.m of the house will be heated so 5 heating zones and of course HW too, unvented cylinder.
Am hoping to run the two boilers on reverse return into a low loss header then run hot water flow and return plus suitably sized heating primary from low loss header. Zone valves as the heating rises to each floor. One large pump to deal with the head height of about 10m.
House is around 200 years old I believe. High ceilings on the 2 middle floors, 4 and 3.5m high respectively. All work needs to be done as sympathetically as possible to the building as it's grade 2 listed.
All I've ever priced is normal domestic houses! Happy with designing this and pricing the materials up but how long should I allow for this? The house is around 15x12m and new pipework will most likely need to be surface run in corners of rooms to rads, chasing into walls is not going to be an option here. Decorative mouldings in all rooms to do nice bends around too!!
Don't want to price myself out of the market but this is a big job and don't want to work for nothing either. Also need to run hot water pipework from the cylinder on the ground floor up two floors to the bathrooms around 15 metres run for each (next to each other).
If anyone could give me prices for labour for comparable systems they might have installed that would be great.
Am hoping to run the two boilers on reverse return into a low loss header then run hot water flow and return plus suitably sized heating primary from low loss header. Zone valves as the heating rises to each floor. One large pump to deal with the head height of about 10m.
House is around 200 years old I believe. High ceilings on the 2 middle floors, 4 and 3.5m high respectively. All work needs to be done as sympathetically as possible to the building as it's grade 2 listed.
All I've ever priced is normal domestic houses! Happy with designing this and pricing the materials up but how long should I allow for this? The house is around 15x12m and new pipework will most likely need to be surface run in corners of rooms to rads, chasing into walls is not going to be an option here. Decorative mouldings in all rooms to do nice bends around too!!
Don't want to price myself out of the market but this is a big job and don't want to work for nothing either. Also need to run hot water pipework from the cylinder on the ground floor up two floors to the bathrooms around 15 metres run for each (next to each other).
If anyone could give me prices for labour for comparable systems they might have installed that would be great.