going to start plumbing in the water side of the system i am working on at the moment (finished putting in the heating side) the cold connection at the boiler is 15mm. im looking at running in 22mm from the mains and reducing down to 22mm closer to the boiler also withe the hot side comeing from the boiler in 15mm and Teeing of to the bath in 22mm.
or can i just do the lot in 15mm
any thoughts or ideas
or can i just do the lot in 15mm
any thoughts or ideas