I've want to take a spur off the short section of 25mm MDPE pipe going into the house just just after the stop tap. It's to get full pressure for the outside taps otherwise the 15mm pipes snake all the way through the house to the outside tap. The question is what should be done to comply with regs and avoid any possible siphoning back into the supply? Is is permissible to fit an inline check valve into the spur line before it reaches the taps? Mains pressure is 6Bar.
Thanks
Thanks