A
Aqua Mechanica
Old low lever toilet was removed, concrete floor broke out to reveal 4" clay pipe.
Pipe cut down, flexible pan connector inserted and bent to suit new Grohe Rapis SL frame for Wall Hung Pan.
Floor backfilled with ballast and cement but area around clay pipe and new flexible pan connector left open and pea shinlge packed around it ready for a 2" screed.
Anything wrong with that?
Pipe cut down, flexible pan connector inserted and bent to suit new Grohe Rapis SL frame for Wall Hung Pan.
Floor backfilled with ballast and cement but area around clay pipe and new flexible pan connector left open and pea shinlge packed around it ready for a 2" screed.
Anything wrong with that?