D
djob
Just wanting some advice about a job I've got coming up.. I have two cast iron soil pipes to do on an old Tannery conversion. Basically I've temporally used 4" soil pipe to be able to pass an inspection now it's time for the real thing.. Obviously being an old building nothing is easy, if you look at the picture of the temporary soil you can see that the clips are packed of with copper; this won't be the case when using the cast iron, my question to you is how would you pack the clips of the wall for the best finish.. I'll put pictures of the cast clip fittings as well. Any advice or if you would do it another would be great. Thanks