P
proelitegas
property is a old pub being converted into 4 flats..transco will be installing 4 external meters housed in semi concealed boxes..property has a basement..first floor will have 2 flats and second floor will have 2..question is can the pipework be routed through the basement to each flat under floor? with AECV at point of entry or does it need to be installed in a shaft?