Just had an email that has made my heart skip a beat saying I have a gas leak of .75mbar on an install that has been in for 8 months. I guess the engineer has used an electronic meter as its a national company so if I recall that is .25 tolerance for the electronic gauge which brings it down to .5 drop.they state as new install its allowed no drop however when I installed 8 months ago it had no drop on day of commission which imho is then classed as new install.
Would you guys still class this as new install ?
Also the sub meter and pipework is in a cleaning cupboard so God knows what has been flattered into it over last few.months.
Their is an appliance as well on pipework
Their is also no smell of gas
Also do you think the engineer should have just used common sense here?
Would you guys still class this as new install ?
Also the sub meter and pipework is in a cleaning cupboard so God knows what has been flattered into it over last few.months.
Their is an appliance as well on pipework
Their is also no smell of gas
Also do you think the engineer should have just used common sense here?