Gas Meter Move | Gas Engineers Forum | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Gas Meter Move in the Gas Engineers Forum area at Plumbers Forums

Status
Not open for further replies.
P

Peter Niss

Hello folks,

We are in process of moving our gas meter from inside to an external cabinet. Builder put cabinet in and National Grid has been and moved the supply to new cabinet -- new Emergency Control Valve in the cabinet and capped off. Now EON wants £400 to move the meter from old location to the new cabinet. But I am sure the National Grid surveyor told me a Gas Engineer with the right Gas Safe qualification can do that. Have I got that right, and can anyone advise what Gas safe Qualification type is needed to move meter?

Cheers

Peter
 
indeed a met 1 is the ticket, but what is going to happen to the pipe remaining, I presume you want that cut off as well rather than having a live pipe under vyour stairs or where ever, unless they have already cut it off. If so, I bet the meter can move magically and be re-positioned when your gsr connects it to your new pipe run.
 
Met 1 qualified and a bit tidy up of the pipes. Probably no more than £200 if shortish run in 22mm
 
Thanks for the replies -- in answer to the question above from Lame Plumber, the old pipe has been completely disconnected by National Grid. Now just have a nice new yellow plastic pipe from main under pavement to new ECV in new meter cabinet. Now just need the meter moved. I'll ask the builder if his Gas Engineer can move the meter when he runs connection to new boiler. Cheers, Peter.
 
change supplier, and get the new one to provide a meter, will probably work fine if you ask
 
Status
Not open for further replies.

Similar plumbing topics

Even if you did move the meter to the "vacant"...
Replies
3
Views
1K
you will have to call the gas transporter /...
Replies
1
Views
889
Have to agree its not pretty but not unsafe . Kop
Replies
9
Views
2K
Yeah sorry, crappy powerpoint skills rather...
Replies
4
Views
3K
Need to contact the gas networks as the supply...
Replies
1
Views
1K
Back
Top