If my gas safe registered engineer is qualified to do pipework is that sufficient to renew the gas pipe right back from the meter or do I need someone who is qualified to work on meters?
I do not intend to do this myself but want to make sure whoever I employ is properly qualified and not over reaching themselves.
The current pipe is 28mm for the first foot and then reduces to 15mm. I want a completely new pipe 28mm off the meter.
I do not intend to do this myself but want to make sure whoever I employ is properly qualified and not over reaching themselves.