- Messages
- 5,168
I have to get a gas pipe from one side of the kitchen to the other, which is about 2 metres. For a hob. The floor is concrete and I see in the viper book it says you should keep as close to the load bearing walls or foundations as possible. But, is it ok to run it straight across the room? As long as it is covered by 50mm of screed?