at the moment i have 5 radiators 1 double and 4 single panel. they all are 40 odd years old , i want to relace all with double panel ones. would my boiler cope ok ?. it is a condenser boiler and the tank in the loft is open vented. hope some one can give me any advice. thanks.
 
there ok but i would ignore the warranty, make sure you inspect them for damage tho
 
Ignore because they're not likely to honour it, or because warranties on rads not likely to be required?

both as they will want system water tests and they will blame it on corrosion
 
On what basis, it’s based on heat loss and correct sizing

The OP may be thinking of the case where the 'correct' sized radiator needs 80°C/60°C to heat the room but the oversized replacement can work with 60°C/40°C. The latter allows the boiler to work in condensing mode. Correct in theory, but in practice many 80/60 systems have subsequently been double-glazed, etc. and are sufficiently oversized for the return temp to be below 50°C most of the time anyway.
 
The OP may be thinking of the case where the 'correct' sized radiator needs 80°C/60°C to heat the room but the oversized replacement can work with 60°C/40°C. The latter allows the boiler to work in condensing mode. Correct in theory, but in practice many 80/60 systems have subsequently been double-glazed, etc. and are sufficiently oversized for the return temp to be below 50°C most of the time anyway.

Good point a definite maybe
 
The other thing to weigh up is the cost of new rads throughout compared to your annual gas bill, you will probably find that it would take decades to pay them off with any potential savings. Even from an ecological perspective, any reduced co2 emissions are wiped out by the co2 required to manufacture and transport the new panels.
 
The other thing to weigh up is the cost of new rads throughout compared to your annual gas bill, you will probably find that it would take decades to pay them off with any potential savings. Even from an ecological perspective, any reduced co2 emissions are wiped out by the co2 required to manufacture and transport the new panels.
so best to replace with single panel i guess
 

Similar plumbing topics

Morning All, I have 1800’s farm house 3...
Replies
0
Views
933
I once had a similar experience with my old...
Replies
6
Views
948
My advice having seen all the replies - leave...
Replies
7
Views
1K
A decent water pressure and flow will be...
Replies
4
Views
1K
  • Locked
RGI fix only dangerous for untrained and non...