Hi mate. I'd like some advice from you please.
Have a fellow engineer who is thinking of putting a LLH on a system due to primary boiler pump not man enough for CH index circuit.
I dont know which boiler (he hasn't got back to me) but its a 30KW combi.
Currently there is an UFH circuit and 11 radiators.
He would like to know how would he go about wiring up this new layout so the CH circuit pump only energises when the stat is calling for it and no back feed from system at other demands.
I've had a look at the wiring and have an idea but not sure if its correct. My idea was to take out radiator 2 port altogether and call from stat supplies a feed to new pump along with neutral and earth and also supply feed to a relay. The grey wire would be the common to relay output and orange the switch live, that way the pump only runs when being called for.
Please can you confirm mu idea or correct me if I'm wrong so I can get back to him.
Thanks
Hi mate. I'd like some advice from you please.
Have a fellow engineer who is thinking of putting a LLH on a system due to primary boiler pump not man enough for CH index circuit.
I dont know which boiler (he hasn't got back to me) but its a 30KW combi.
Currently there is an UFH circuit and 11 radiators.
He would like to know how would he go about wiring up this new layout so the CH circuit pump only energises when the stat is calling for it and no back feed from system at other demands.
I've had a look at the wiring and have an idea but not sure if its correct. My idea was to take out radiator 2 port altogether and call from stat supplies a feed to new pump along with neutral and earth and also supply feed to a relay. The grey wire would be the common to relay output and orange the switch live, that way the pump only runs when being called for.
Please can you confirm mu idea or correct me if I'm wrong so I can get back to him.
Thanks