Help with a Plumber/Gas engineer Combi install wrong? | Gas Engineers Forum | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Help with a Plumber/Gas engineer Combi install wrong? in the Gas Engineers Forum area at Plumbers Forums

Status
Not open for further replies.
T

Tommyo

Hey this is a message really for more experience gas fitter, I am newly in to the industry and things in a job do not sit right. Maybe you can help me.

My friend had a extension built in replacement of his Lean to, I went around to visit yesterday and he is still having work done on the extension, the electrician needs to finish etc,
So he has a CDI 29 installed.
He had a plumber and a gas safe engineer doing the boiler.
Boiler was installed around 2 months ago, and the gas engineer plugged it in via plug socket and said he will come back in a week and flush it out then, he did not install the clock and told him to leave the boiler on full for a week.

So he has not come back as yet and say he will do, I am questioning a few things can you help?



  • I was told to power flush before putting the old water through the boiler other wise warrant is void?


  • The boiler is just plugged in at the moment and in use and the boiler has no commissioning paperwork filled in as yet either which means no evidence to say he has tested for gas drop or flue gases


  • The PRV just drops down about 100mm and discharges in to same pipe as condensation pipe and is just open ended it goes in to a cut piece of 40mm waste pipe internally and not covered or sealed, further down the condensate pipe goes in to the same pipe and then that goes outside and discharges in to a drain and not insulated. (again I was taught to terminate it on a separately externally in to a mushroom or a street elbow.


  • The Gas pipe from the Gas main to the externally passage way has been sleeve but it has not been sealed on the annualar space at all, the sleeve is loose.


  • The gas pipe has come through the extension ceiling and ran about 10 metres in the ceiling and behind the plaster in to the boiler. (I thought you was not allowed to run it in spaces like that which are not accessible for inspection).

So basically has the install been done right and should he be using the boiler if it has no commissioning done on the boiler? the plumber was the builders and the gas man was the plumbers, at the moment the plumber is not returning his calls. I told him to ask for a gas safe inspector to visit as it doesn't seem right but maybe its more building regs than gas safe.

Thanks in advance guys.
 
post some pics up of the install
 
post some pics up of the install

Photo 22-01-2016, 21 01 23.jpg
Photo 22-01-2016, 21 01 26.jpg
Photo 22-01-2016, 21 01 28.jpg

Best I could get
 
prv and condense are wrong prv needs to be in copper all the way and condense needs to be sealedthe bending on the copper is excelent but unnecessary the copper should be on the wall and the plastic shouldnt be there he has made a simple job difficult
 
Last edited:
prv and condense are wrong prv needs to be in copper all the way and condense needs to be sealedthe bending on the copper is excelent but unnecessary the copper should be on the wall and the plastic shouldnt be there he has made a simple job difficult

This is what i have been taught condestate is in its own chamber sealed with glue, then the PRV is seperate through the external wall and bent over.

What do you think about the leaving of it for 2 months with no commisioning and clocks on ?> to me its just ringing alarm bells..
 
This is what i have been taught condestate is in its own chamber sealed with glue, then the PRV is seperate through the external wall and bent over.

What do you think about the leaving of it for 2 months with no commisioning and clocks on ?> to me its just ringing alarm bells..

if hes fga it then fine alsong as he fills the book in when finished and plug top is fine
 
Perhaps we are too cautious where I work but when we come across a similar configuration (open tundish with combined prv pipe) this would be classed as At risk and then rectified. Also a label should be attached to the boiler stating that is an uncommissioned appliance
 
I don't remember reading a prv had to be in copper. I also thought prv,s are ok in a tundish, like unvented cylinders.
obviously combined like this is wrong.
 
Last edited:
Status
Not open for further replies.

Similar plumbing topics

Ok I think I see what your saying mate, So...
Replies
9
Views
727
Finally got an update from him. He cant do the...
Replies
2
Views
796
If he's cautious, the plumber will want to...
Replies
3
Views
676
Have to agree its not pretty but not unsafe . Kop
Replies
9
Views
2K
I feel for you, it's a bad position to be in...
Replies
18
Views
2K
Back
Top