- Messages
- 3
hi,
I'm putting a new toilet in my extension and there is roughly a 4m horizontal run from the new toilet location where it then drops vertically down to the under croncrete soil pipe.
The issue is that I've currently got two 92.5 branch fittings connecting this horizontal run to the vertical AAV position (left fitting in photo) and wall hung toilet (right fitting). Is this the correct way to do this?
Cheers,
I'm putting a new toilet in my extension and there is roughly a 4m horizontal run from the new toilet location where it then drops vertically down to the under croncrete soil pipe.
The issue is that I've currently got two 92.5 branch fittings connecting this horizontal run to the vertical AAV position (left fitting in photo) and wall hung toilet (right fitting). Is this the correct way to do this?
Cheers,