- Messages
- 750
Right guy's just a bit advice really please..
Got quite a big job to price for a customer I do work for, well it's big to me as I'm just really common with your typical 8 rad heating installs and breakdwons etc
Anyway, the hosel has 4 floors consisting of 12 rooms
Each room has a kitchen and an ensuite, which currently has an Electric shower.
The owner is stating he want's mixer showers putting in
I recently put a new boiler in his own house, a Ravenheat 150btu combi which he bought himself. I don't really rate Ravenheat but it was his choice, and he want's to put a few in the hostel now.
THe Hoste has and Industrial meter u40, I think ?
As I said earlier, this job is quite big compared to what I normally do and to be honest the first thing I thought was 12 showers running at the same time (possibly) combi's no chance ? Even if you had 3, wouldn't the main struggle with such a demand ?
I've haven't got my unvented ticket so don't know too much about it, but system boilers and unvented a better idea ?
A lad I know mentioned boosted cold water, something I'm not familar with.
Obviously, if it is one of the latter 2 I'd have to bring somebody in as it's not really my game.
Cheers, advice appreciated
Got quite a big job to price for a customer I do work for, well it's big to me as I'm just really common with your typical 8 rad heating installs and breakdwons etc
Anyway, the hosel has 4 floors consisting of 12 rooms
Each room has a kitchen and an ensuite, which currently has an Electric shower.
The owner is stating he want's mixer showers putting in
I recently put a new boiler in his own house, a Ravenheat 150btu combi which he bought himself. I don't really rate Ravenheat but it was his choice, and he want's to put a few in the hostel now.
THe Hoste has and Industrial meter u40, I think ?
As I said earlier, this job is quite big compared to what I normally do and to be honest the first thing I thought was 12 showers running at the same time (possibly) combi's no chance ? Even if you had 3, wouldn't the main struggle with such a demand ?
I've haven't got my unvented ticket so don't know too much about it, but system boilers and unvented a better idea ?
A lad I know mentioned boosted cold water, something I'm not familar with.
Obviously, if it is one of the latter 2 I'd have to bring somebody in as it's not really my game.
Cheers, advice appreciated