4,236
I have been doing constant bathrooms this year, I keep saying "this is definalty the last one I do this year" but I've just taken on two more.

I work totally on my own and each bathroom I take great care to get everything bang on perfect and totaly durable etc.

The average bathroom with toilet, basin, bath/shower enclosure, built in/exposed shower, plaster ceiling, full floor and wall tile, moasic boarders, tile trim absoluty no corners cut.

Average 15 days.

I've just been for another quote and he said the first guy said he could do it in 7 days on his own, there was a hell of a lot of work in that bathroom.

I'm not bothered if I get the job or not but I fear he will go for the 7 day option, but I'd love to see the result, just another rushed bodged bathroom. :(
 
I have the same approach & 15 days sounds about right when you're doing everything on your own. You do need a bit of contingency for when customer changes spec etc. Someone might do it in 7 days, but it will be terrible!
 
I'm glad I'm not the only one reckoning on a good 2-3 weeks. I've not done enough of them yet to want to stop taking more on though.

One thing I particularly like doing is buying a couple of nice extras (e.g. candles or decorative bottles) and giving the bathroom a really, really good clean and polish (including cleaner in the WC!) Seems to go down especially well with some customers.
 
I find this interesting. Can you post a break down of the works. Eg. Isolating and removing old suit 3 Hours, Running new pipework to sanitary fitting position 3 hours, etc.
 
Hi Phil,

I feel i could help on this question , because bathrooms are my thing.

7 day does sound really suspect, we both now it takes time to do things properly and get a solid job. Im sure you do a first class job, but its one thing saying to the client and another thing showing.

Can you show him any of your previous work ?

On the other hand, do we think a client would want to be in their eyes, in upheaval for 3 weeks.

Sometimes i suffer the same questions. where i allow enough time to do it properly, alter cast iron pipe to below floor level as to get waste s under floor, nice new soil coming upto meet pan connector. hide all pipes. mark out with sanitary in place as to get pipework well hidden but access to border valves. and so on with tiling and woodwork. Its our passion isnt it. No doubt something is a miss with this guy.

Here is what i do now, i bring in someone elsejust to give me a hand to move things along, basically just to labour , cut tiles , mix up plaster. i do all the install work so keeping it under my quality control.

I cant let go! Do you feel the same, is this why you do it on your own ? So you know its done right.

One thing i have learnt in a lot of years doing this, after 10 days people really want you out the way.

would be glad to hear more from you , this is an area i work in all the time

Warren
 
i think 2 weeks is the norm.

Do you find that clients these days want the extra bit to really make it personal to them, like little alcoves to put their shampoo. I have been asked to do alsorts, i think its great but when you think about the man hours these little details add on, especially when they are done properly
 
There's the difference ... "New pipework in three hours"

It takes longer than this to pull up the floor, organise the pipe runs, notching and drilling joists so hiding as much pipework as possible. Another area where hiding pipework is not possible is to have chrome pipework coming up from the floor in exactly the correct place. To do this properly takes time and trouble.

Justlead1, I'm not having a go at all - just trying to show how do a better quality job takes time. I've changed a WC in a couple of hours before now but the quality just wasn't there for that job (and nor was the money!!)
 
do you guys have any pictures of your work ?

i love to see quality work.

I agree with dontknowitall, time just seems to disapear, but its worth it to look at the finsih job and the client say it has turned out better than i ever thought.

Most jobs i never get a snag list, im quite smug on loft jobs where my plumbing and bathroom work is a "no snag" and the loft contractor has about a page....lol
 
I may decide not to carry on with bathrooms next year, I can only work on them during normal working hours and I'm out quoting and doing other jobs in the evenings. I find when I';m only doing a bathroom and not other jobs I can do them alot quicker.

Most bathrooms are recommendations and the ones that aren't I wont do the job if I find them awkward in any way.

With me being a perfectionist I like to take my time and get top notch results, this is why I'm always busy with them.

I would love to be able to get perfect results in ten days but it wouldn't be long enough, the bathroom I'm doing at the moment for instance will be a good 15 day'er, its for a neighbour of a friend. They have an ensuite to use and they are at work all day (leave me with key) so their disruption is minimal. This is comman to most of my bathrooms.

But I will probably give them a rest for a bit next year, I do a lot of work for a local landlord who has 30-40 houses, I can turn those round in a week as he just wants a very basic bathroom with those awfull white 6 inch tiles on rough walls. He knows I don't like doing them in a week but he's happy with the result (not my usuall high standard but still durable and long lasting).
 
:eek:

Thank you! Lovely customer to work for and this makes a huge difference as I'm sure you know.
 
I think the most important thing to remember is that is the way you work, you get a good result and the client is happy.

I think if a potental client is bickering over money or time, let someone else deal with them.

You know your good, just think to yourself "sh**, it takes time to be this good"

all my pics are on my fan page on facebook, blimey i even made a video of a finished install. pm me if you wanna see (my old laptop hard drive went lost all my pics on that, all the res is wrong to pull them down from facebook
 
absolutely the nicer the customer the more you want to bend over backwards

steve
 
Or forwards if she's pretty ...

COUGH!!! Dontknowitall ... Honestly!!
 
Please do not take my post as a jib. I am sincerely interested in the timing of element involved in such a task. It may well identify areas where both time and money saving could be made.
 
It takes about 20 years to do this....lol

About 2 weeks, Travatine tiles gobble up alot of time. Picture 004.jpgPicture 012.jpgPicture 014.jpgPicture 010.jpg
 
Nice one Warren!!

Justlead1 - I felt no offence with your post - hopefully you read mine as I intended it to be read too!
 
Stunning pictures warran, how long have you been doing bathrooms?

I like the way you've continued the grout lines from the wall to floor, not easy if the room is out of square!

Your attension to detail is like mine, but it would take me twice as long to get that result.

I find the tiling the most time consuming, the endless cutting!!!

The straight foward plumbing is fairly quick though, built in showers can take time aswell, it pays to spend time getting the valve solid and the right distance back.

Those fixed showerheads are a pain, the ones that come with a 1/2" brass backnut, whats that all about? I resort to using a backplate elbow and fix it in such a position that when I come to screw in the showerhead after tiling it ends up pointing down and is watertight. Again, time consuming.
 
Thank you Phil and Steve,

i have been installing bathrooms for 25 years, running my own company for 8 years.

Tip* mark out the floor first, make sure it will give you good cut on the walls, then tile floor first, just spirit level off of the floor joints and you have every wall match up....easy

Attention to detail is everything, turn out the quality and the client is blown away. is it pleasing to the eye???, bingo,thats what the client sees.
I dont cut many of my own tiles. Lets put it like this, im to expensive to cut my own tiles i have a lad for that. I do what he cant!

Cut your install time down by using someone to do the lacky jobs. Do you honestly lump 30/40 sqm of tiles up the stairs and into the bathroom yourself, get up and down from your trestle to cut tiles. sweep up, cut bits of batten, clean up fittings, put your sheets down, wash off the grout, pull your own bends.

I dont, but i oversee a lad that does it can really cut down on your time, also i dont find myself so shattered at the end of a day.

I guess that the back nut is for stud walls, god knows how you are suppose to tighten it up after....lol. Like you i use a wall plate elbow.

Its all about finding the balance between quality and urgency. if you spend 3 weeks on a bathroom whats the labour charge like ?,

I love what i do and im glad i have found so many good trdesmen on this forum , thought we were a dying breed
 
Hmm!

Perhaps a few well padded clients can afford a man for three weeks. What are your "el cheapo" landlords bathrooms like? Please don't get me wrong I am not criticising just pointing out that most Plumbers have to do "el cheapo" jobs for clients who have problems affording the "posh" stuff.

Also we don't have "lackeys" slavery has been banned since 1806 in the UK. But some companies have yet to catch up with the idea perhaps?:):)
 
Bernie,

My wife does moan at me for grammar and english, but she is a English teacher.

I am a bathroom specialist, i think my pic's prove that.

Sorry for the incorrect use of words prehaps, helper.... Each to there own i guess

Regarding your first comment although i think that was for someone else, here is my take on it.

Like i said its a balance, i have completed lots of cost effective bathrooms, the sanitary fittings are generally lower priced, they are more basic in design
and generally ceramic tiles.

I would say that a basic bathroom you could say around a week, still completed with a good finish and using quality materials, so price quite a bit less.

Dont like the word "el cheapo"

its the difference between fitting a close coupled pan and cistern
or
a grohe frame and wall hung pan and then dressing the frame with tiles or a nice hardwood

Sounds like Phil will not cut corners to make it quicker, as i say" it is what it is"

I think when you are in the realms of a bespoke bathroom, its like telling a brain surgeon to "hurry up"
 
A good plumber "should", in the majority of cases be able to strip out and rough a standard size bathroom easily in a day.
Give another 2 days to reform anything that needs doing and fit bath and tray then 2 days to tile the place (say 16 meters wall and 4 on the floor)
Another day to grout and a day to fit ware and clean down.
7 days (probably less)

Anyone who thinks a quality job can't be done in 7 days needs to break a bit sweat and stop thinking so much.
 
Status
Not open for further replies.

Similar plumbing topics

  • Question
We did bathroom and kitchen renovation last...
Replies
12
Views
3K
  • Question
Yours is an old fotic cylinder, Thermal store...
Replies
1
Views
1K
  • Question
Ok thank you Chuck, yes it does a bit 😆 That's...
Replies
6
Views
571
Pump/feed/expansion are piped/in wrong...
Replies
9
Views
1K
I am not in the trade but from what you say...
2
Replies
41
Views
8K
Back
Top