P
PlumbBobBob
I have been asked to run power to a new shower installation, only thing is when i went to see it they had tiled then decided that they wanted a shower as an afterthought!!
The water pipe comes down from the bottom of the shower, along the top of the bath, down the edge of the bath and along the floor to the tap end. The bath panel won't fit back properly and it just looks total carp.
How would any of you go about refusing this work politely?
The water pipe comes down from the bottom of the shower, along the top of the bath, down the edge of the bath and along the floor to the tap end. The bath panel won't fit back properly and it just looks total carp.
How would any of you go about refusing this work politely?