Renovating an older property with good water pressure. Proposing combi on 1st floor, but am not sure if it should be 1st take-off... If it were to be it would mean doubling back pipework to kitchen and then back upstairs to service sinks etc.. Then there is the electric shower supply... Any commonsense advice appreciated re the best way to lay out the pipework.