As part of a rebuild (added 1st floor to bungalow and extended back) we have removed every piece of plumbing and electrics, during COVID
In preparation for the complicated stuff, during the build we have ...
- Copper pipework (3m) installed from boiler site to adjacent to tank
QUESTIONS
I need to get a new boiler installed at the site of the old boiler in downstairs utility. Gas supply exists but new hole for flu required. Electrics installed by electrician . Boiler needs connecting to copper primary to tank and connecting to tank in airing cupboard.
Secondary expansion is connected to incoming control unit but primary expansion although in situ is not connected at all.
I am trying to get someone local to do the whole job but am thinking of the Gas Safe and G3 done separately.
1 I can get a boiler installed and connected to primary pipework but is that sufficient for the Gas Safe certificate or does the whole primary need to be there for certification.
2 Same with the tank
It does seem to be making the whole thing more complicated
I am happy to disconnect everything from the tank and balance the central heating etc. I am also happy to get someone in later to balance the whole system.
If I can I will get someone to do both but if not do i have any options re Gas safe and G3.
Thanks
Brian
In preparation for the complicated stuff, during the build we have ...
- Gledhill unvented tank (preplumbed) placed in 1st floor airing cupboard
- New radiators and pipework in CH system piped back to 1st floor airing cupboard via up and adjacent to Gledhill tank but not connected at all
- Electrician has connected all heating/hot water controls attached to preplumbed tank plus 2 zone CH thermostats and HW.
- No primary circuit water connections whatsoever connected to tank
- incoming main connected to incoming control valve
- hot flow from tank connected via new pipework to en suites, bathroom and kitchen. Water heated via immersion only connected by electrician.
- Copper pipework (3m) installed from boiler site to adjacent to tank
QUESTIONS
I need to get a new boiler installed at the site of the old boiler in downstairs utility. Gas supply exists but new hole for flu required. Electrics installed by electrician . Boiler needs connecting to copper primary to tank and connecting to tank in airing cupboard.
Secondary expansion is connected to incoming control unit but primary expansion although in situ is not connected at all.
I am trying to get someone local to do the whole job but am thinking of the Gas Safe and G3 done separately.
1 I can get a boiler installed and connected to primary pipework but is that sufficient for the Gas Safe certificate or does the whole primary need to be there for certification.
2 Same with the tank
It does seem to be making the whole thing more complicated
I am happy to disconnect everything from the tank and balance the central heating etc. I am also happy to get someone in later to balance the whole system.
If I can I will get someone to do both but if not do i have any options re Gas safe and G3.
Thanks
Brian