I'm sure this will have been covered but I cant find the answer.
I want to put a twin 1.5 bar shower pump feed in. Due to difficulty running new pipes from cylinder. Could I tee off before the first services (ie sink then bath). I am aware there would be a danger of air being drawn back, so is it possible to fit a directional flow valve after the tee to the pump and before the sink to solve this possible problem (on both hot and cold feeds)
I want to put a twin 1.5 bar shower pump feed in. Due to difficulty running new pipes from cylinder. Could I tee off before the first services (ie sink then bath). I am aware there would be a danger of air being drawn back, so is it possible to fit a directional flow valve after the tee to the pump and before the sink to solve this possible problem (on both hot and cold feeds)