The client heated the space to over 40c and approx 100m of side wall insulated panelling with a cement based inner skin have cracked badly. Probably about £5ooo pounds worth of damage.
His aim was to get the slab temp to 30c.
The ceiling (approx - 1500 sq/M) has the same material and has not failed.
Two huge commercial gas blow heaters!
Does gas heating suck the moisture from the air?
The client is going ballistic and is with holding £50k payment.
We are at a loss as to why this has happened. Any help appreciated.