I am looking into a new Main eco compact / Baxi 618 system boiler set up for PDHW (if its possible)
I was hoping to use the EPH controls priority hot water pack
I currently have a 15year old HWC around 900mm tall by 450mm dia
would I benefit from a new fast recovery HWC for the system (I prefer the new to be a vented jobbie)
NOTE: my old boiler has died it was a very old (50 years maybe) open flue and gravity hot water -new boiler going in different position so most pipework gotta be renewed. heating engineer already booked to install new system in a week or sos time and he asked me what I wanted: he quoted initially for a simple S plan, but IM thinking PDHW might be a better solution long term
any advice anybody can give would be most helpful
PS: would a fast recovery HWC be same size or could it be smaller as faster reacting?
I was hoping to use the EPH controls priority hot water pack
I currently have a 15year old HWC around 900mm tall by 450mm dia
would I benefit from a new fast recovery HWC for the system (I prefer the new to be a vented jobbie)
NOTE: my old boiler has died it was a very old (50 years maybe) open flue and gravity hot water -new boiler going in different position so most pipework gotta be renewed. heating engineer already booked to install new system in a week or sos time and he asked me what I wanted: he quoted initially for a simple S plan, but IM thinking PDHW might be a better solution long term
any advice anybody can give would be most helpful
PS: would a fast recovery HWC be same size or could it be smaller as faster reacting?