Hi everyone need a little help. I am planing on moving my bathroom and need to run a new soil pipe. Luckily for the most part the joists don’t get in the way except at either end of the run.
My joists are 175mmx60mm, obviously I don’t have death wish so can’t just punch a 115mm hole either end through the joist. I have been looking at these metwood steel joist reinforces, they make them for 8x2inch US beams but can make custom ones for my beams and allow upto a 4.5 inch hole (115mm) hole. Anyone have any experience with these? If not what other options do I have? I can’t run it over the top as there is floor to ceiling windows in would run in front of and can’t put in a new soil stack. It has go through through the joist one way or another.
The other thing I have seen which I saw on the web but can’t find again annoyingly is some sort of sleeve which replaces the end part of the joist with steel that can then have a hole in it. I made a crude drawing to show.
If not any other ideas?
Many thanks
James
My joists are 175mmx60mm, obviously I don’t have death wish so can’t just punch a 115mm hole either end through the joist. I have been looking at these metwood steel joist reinforces, they make them for 8x2inch US beams but can make custom ones for my beams and allow upto a 4.5 inch hole (115mm) hole. Anyone have any experience with these? If not what other options do I have? I can’t run it over the top as there is floor to ceiling windows in would run in front of and can’t put in a new soil stack. It has go through through the joist one way or another.
The other thing I have seen which I saw on the web but can’t find again annoyingly is some sort of sleeve which replaces the end part of the joist with steel that can then have a hole in it. I made a crude drawing to show.
If not any other ideas?
Many thanks
James