- Messages
- 1
Hi Everyone,
Just joined the site; I am a DIY'er with many years experience. I always try to "Do It Right"; buying the correct tools for the job; whatever it is. I am nearly finished with a bathroom refit; this has been interesting . I found 40mm waste pipe running flat notched into joists over 4 metres ... had to hang 50mm off the end of the joists to get flows correct and redo all the waste connections for the bathroom and to an en-suite too... ho hum.
Looking forward to reading more of the posts on the site.
BR
Nigel
Just joined the site; I am a DIY'er with many years experience. I always try to "Do It Right"; buying the correct tools for the job; whatever it is. I am nearly finished with a bathroom refit; this has been interesting . I found 40mm waste pipe running flat notched into joists over 4 metres ... had to hang 50mm off the end of the joists to get flows correct and redo all the waste connections for the bathroom and to an en-suite too... ho hum.
Looking forward to reading more of the posts on the site.
BR
Nigel