Called out to a busted Keston K50 heap
Parts are unobtainable now so the only option I have is new boiler
Installation is in a small three story block of flats and all flats have the same boiler in the centre of each property with all the flues running through all sorts of voids - nightmare.
As the boiler isn't working I obviously haven't had to worry about at risking it.
I'm stuck with the dilemma of replacing the boiler in the same site and then obviously running a flue to an outside wall and then box it correctly in terms of inspection. or I could resite the boiler in the kitchen about 6 m from the airing cupboard but I am faced with solid floor and ceilings to re-route all the necessary pipework.
Short and sweet question is really can anybody think of any other alternatives that I might have missed as I can honestly say this is turning into an absolutely huge job
Parts are unobtainable now so the only option I have is new boiler
Installation is in a small three story block of flats and all flats have the same boiler in the centre of each property with all the flues running through all sorts of voids - nightmare.
As the boiler isn't working I obviously haven't had to worry about at risking it.
I'm stuck with the dilemma of replacing the boiler in the same site and then obviously running a flue to an outside wall and then box it correctly in terms of inspection. or I could resite the boiler in the kitchen about 6 m from the airing cupboard but I am faced with solid floor and ceilings to re-route all the necessary pipework.
Short and sweet question is really can anybody think of any other alternatives that I might have missed as I can honestly say this is turning into an absolutely huge job