Hi - need some sensible advice please
I am fitting a new shower in the corner of my bathroom. I've got 18mm chipboard on the floor topped with 9mm plywood with a hole for the waste, a plumber has fitted the waste in place, flexible to marry up to the tray. On the walls I've taken down the plasterboard and replaced with Hardibacker all round the shower area, so at the moment it's a bare shell of board/ply.
The tray is a low profile 25mm one with no lip etc, 900mm curved quadrant with a flat base for cementing. I'm worried about 2 things mainly, around tiling :-
1) I am keen to tile the floor first then seat the tray on top of this, as it's low profile and would give a good seal round the bottom of the tray. Is this sensible specifically with a low profile flat bottom tray? I'm also worried if I tile first the waste won't sit flush with the depth of 18mm chip Plus 9mm ply plus 25mm tray - but if I tile up to it, it will be VERY low, and there's a risk of leaking or needing loads of silicon.
2) Should I fit the quadrant flush with the Hardibacker then tile down onto it? This seems like the most popular approach but i'm concerned that i'll lose radius from the curved tray and the enclosure won't fit. What's the best way of doing this?
Thanks!
I am fitting a new shower in the corner of my bathroom. I've got 18mm chipboard on the floor topped with 9mm plywood with a hole for the waste, a plumber has fitted the waste in place, flexible to marry up to the tray. On the walls I've taken down the plasterboard and replaced with Hardibacker all round the shower area, so at the moment it's a bare shell of board/ply.
The tray is a low profile 25mm one with no lip etc, 900mm curved quadrant with a flat base for cementing. I'm worried about 2 things mainly, around tiling :-
1) I am keen to tile the floor first then seat the tray on top of this, as it's low profile and would give a good seal round the bottom of the tray. Is this sensible specifically with a low profile flat bottom tray? I'm also worried if I tile first the waste won't sit flush with the depth of 18mm chip Plus 9mm ply plus 25mm tray - but if I tile up to it, it will be VERY low, and there's a risk of leaking or needing loads of silicon.
2) Should I fit the quadrant flush with the Hardibacker then tile down onto it? This seems like the most popular approach but i'm concerned that i'll lose radius from the curved tray and the enclosure won't fit. What's the best way of doing this?
Thanks!