Hi sorry if this is a silly question I'm having a new heating system installed ( un vented ) my new mains is due
to be installed ( moled ) in 25 mm MDPE , the Water companies going to replace the communication pipe under the lead replacement scheme ,
however its been suggested to me to have a 32 mm instead of 25 mm however this falls outside of the lead replacement scheme and this was their reply"
" If you still wish to lay a 32mm and wanted us to do the same out end , we would have to ask you fill in a fittings table to so we get an idea of water usage to ensure its needed. You would also have to fill in a separate application and go through the chargeable upgrade process .
so even if I pay the extra ( I don't have a cost yet but guessing its not cheap ) I'm not guaranteed its allowed ,so when finished my House would
have
1 Kitchen Sink , Downstairs Toilet
1 bath / shower mixer , Basin and Toilet 1st floor
1 Shower , Basin , Toilet 2nd floor
so hence the silly Question is it really worth going up to 32 mm ?
Thanks'
to be installed ( moled ) in 25 mm MDPE , the Water companies going to replace the communication pipe under the lead replacement scheme ,
however its been suggested to me to have a 32 mm instead of 25 mm however this falls outside of the lead replacement scheme and this was their reply"
" If you still wish to lay a 32mm and wanted us to do the same out end , we would have to ask you fill in a fittings table to so we get an idea of water usage to ensure its needed. You would also have to fill in a separate application and go through the chargeable upgrade process .
so even if I pay the extra ( I don't have a cost yet but guessing its not cheap ) I'm not guaranteed its allowed ,so when finished my House would
have
1 Kitchen Sink , Downstairs Toilet
1 bath / shower mixer , Basin and Toilet 1st floor
1 Shower , Basin , Toilet 2nd floor
so hence the silly Question is it really worth going up to 32 mm ?