I am looking at installing a thermal store (Glendhill Torrent) and currently have a 15mm water supply from the water meter. Flow rate is currently 24 litres per min with a dynamic pressure of 4.4bars (taken from tank position).
My questions for those with more experience than me are
1) will upgrading the 20meters of 15mm pipe from the water meter to 22mm improve flow rate further even though the incoming plastic blue pipe (diameter 25mm) is reduced to 15mm before it goes into the water meter and as it leaves the water meter before I can make it bigger? i.e Will the restriction make the upgrade to 22mm pointless or is water flow not necessary restricted by the short length of pipe size reduction?
2) It would be easier in this particular installation to create a 15mm ring from the water meter and at the point this ring joins use a 15/15/22 tee to then go off in 22mm to the thermal store – will this work and have a similar effect to 1) above
3) Is either of the above worth doing?
4) Will either options listed above reduce the water noise (currently lots of 90 degree bends creating noisy paperwork) or am I better trying to replacing the 90 degree bends for slow hand bent sections?!
Any advice on the above is appreciated
My questions for those with more experience than me are
1) will upgrading the 20meters of 15mm pipe from the water meter to 22mm improve flow rate further even though the incoming plastic blue pipe (diameter 25mm) is reduced to 15mm before it goes into the water meter and as it leaves the water meter before I can make it bigger? i.e Will the restriction make the upgrade to 22mm pointless or is water flow not necessary restricted by the short length of pipe size reduction?
2) It would be easier in this particular installation to create a 15mm ring from the water meter and at the point this ring joins use a 15/15/22 tee to then go off in 22mm to the thermal store – will this work and have a similar effect to 1) above
3) Is either of the above worth doing?
4) Will either options listed above reduce the water noise (currently lots of 90 degree bends creating noisy paperwork) or am I better trying to replacing the 90 degree bends for slow hand bent sections?!
Any advice on the above is appreciated