Hi Boys and Girls,
I am splitting currently supply inside into 4 and upgrading old 1/2 galvanized supply from the street into building without breaking pavement into waterboard stopcock.
I am using a moling company to bore pipe in through a trench I have dug out. I have agreed to make good hole as the driveway will be redone once all building works are completed.
I am sure I did it in college but I can't remember for the life on me what I need to put down into the trench once connection is done. Is it the same as drainage? 10mm pea shingle then no more than 40mm shingle? Need to get an order in before Tuesday. Any help would be appreciated
Cheers
Adi
I am splitting currently supply inside into 4 and upgrading old 1/2 galvanized supply from the street into building without breaking pavement into waterboard stopcock.
I am using a moling company to bore pipe in through a trench I have dug out. I have agreed to make good hole as the driveway will be redone once all building works are completed.
I am sure I did it in college but I can't remember for the life on me what I need to put down into the trench once connection is done. Is it the same as drainage? 10mm pea shingle then no more than 40mm shingle? Need to get an order in before Tuesday. Any help would be appreciated
Cheers
Adi