maximum numberof by pass rads? | Plumbing Jobs | The Job-board | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss maximum numberof by pass rads? in the Plumbing Jobs | The Job-board area at Plumbers Forums

Status
Not open for further replies.
Messages
38
currently in theprocess of fitting a whole new system

just 1st fixing pipework atm but will eventually be fitting boiler 250l unvented cylinder blah blah blah

my question is the customer wouldlikethe towel rails on the hotwaterside so they stay warm in the summer etc! in total there will 3 towel rails, so my question is, is there a limit to the amount ofrads you can use as a bypass?


thanks
 
not from a technical point of view, however building regs part L may have something to say, worth a read.
 
the customer would like the towel rails on the hotwaterside so they stay warm in the summer etc! in total there will 3 towel rails, so my question is, is there a limit to the amount of rads you can use as a bypass?
Nothing in the building regs to stop you doing that - the circuit will be pumped, which is the main thing. The real question is: will it achieve what the client wants?

If you plumb the rads into the HW circuit they will only heat up when the HW is being heated, say twice every 24 hours. The rest of the time they will be cold.

The alternative is to plumb them as a separate heating zone with a pipe stat (and separate timer if necessary) to control them. That would require an "S plan plus" type of installation.

What ever solution you come up with, the towel rails and cylinder will have to be balanced along with the radiators.
 
Status
Not open for further replies.

Similar plumbing topics

Me too. One pipe at a time, wet vac to hand...
Replies
4
Views
615
A simple thing i'd probably check is the...
Replies
9
Views
1K
He does not even know if the external frost...
Replies
14
Views
2K
Yes the ufh should be separate from the rest...
Replies
1
Views
1K
  • Question
We currently have the ground floor wet UFH and...
Replies
0
Views
828
Back
Top