Hi, In the process of a new build and we have routed a MDPE pipe through a lintel in the DPC but unable to bend it to the correct location due to the bend radius. I have now made the bend radius suitable for the bend but the pipe has no support underneath. Will it be better to put in a 90 degree bend and then run vertically up the DPC to floor level or will this be ok as we need to put in the sand, insulation and concrete on top. I take it that the MDPE pipe will need some ducting over it?
The waste pipe for the toilet is also around 50mm from the rear of the brickwork is this adequate? The MDPE for the mains water is 400mm from the waste pipe.
Thanks
The waste pipe for the toilet is also around 50mm from the rear of the brickwork is this adequate? The MDPE for the mains water is 400mm from the waste pipe.
Thanks