Hi, In the near future would like to change standard boiler for either same or combi , meter is at one corner of house and boiler diagonally opposite, pipe starts at 22mm from meter but ends up 15mm at boiler, concrete floors so assuming pipe goes up to and into 1st floor cavity and accross approx 45'.
I am guessing boards will need to be lifted to check where 22 stops. Is there a way of measuring the gas flow to end of 15mm pipe to see if it is enough to fire a combi? Incidently we have a gas fire in living room but very rarely use it at all, 1 main and 1 ensuite 3 bed detached 12 rads total 3 double cheers guys.
I am guessing boards will need to be lifted to check where 22 stops. Is there a way of measuring the gas flow to end of 15mm pipe to see if it is enough to fire a combi? Incidently we have a gas fire in living room but very rarely use it at all, 1 main and 1 ensuite 3 bed detached 12 rads total 3 double cheers guys.