- Messages
- 869
Hi, got a job booked in to change 2 sets of rad valves on microbore system. The problem is that its a gravity system and the f&e tank is located in a loft 3 storeys above them rads so I forsee real problems trying to fill the system back up.
Whats the best way to approach this?
Whats the best way to approach this?