G
gates1979
I am replacing a rad in the bathroom to a towel rail but the pipes which are microbore are buried in the concrete screed and they need moving closer together. Can i chase the pipe back and solder a extension piece in or is there more involved than that also can i step the pipe up to 15mm so i can fit chrome pipe