About to install a new Mira Platinum on a gravity fed system. The Installation Manual shows the pipework from top of hot water tank coming off at 45 degrees. Can I just T off the existing horizontal hot water pipe at top of hot water tank or even from the vertical pipe going down the back of the tank?