Hi all
Merry Christmas!
I've received a pre-piped steam shower cubicle and the seller has asked me to just connect the mains power and cold + hot water (I've a balanced supply).
For some reason I don't think his pipework at the back is correct (there is no manual to check).
Could somone please check the attached pics and advise if pipes are as they should be?
In the first pic shown below, top control is for selection of outlet tap and the bottom control is ON/OFF (in/out) plus temperature (rotary) control.
In the second pic, pipework is shown from the back side. 2 disconnected pipes for HOT and COLD are shown and the bottom flexi pipe coming out of the 'T' goes to the steam generator on the other side of the corner cubicle.
Any help with this pipework would be highly appreciated.
Thanks..
Merry Christmas!
I've received a pre-piped steam shower cubicle and the seller has asked me to just connect the mains power and cold + hot water (I've a balanced supply).
For some reason I don't think his pipework at the back is correct (there is no manual to check).
Could somone please check the attached pics and advise if pipes are as they should be?
In the first pic shown below, top control is for selection of outlet tap and the bottom control is ON/OFF (in/out) plus temperature (rotary) control.
In the second pic, pipework is shown from the back side. 2 disconnected pipes for HOT and COLD are shown and the bottom flexi pipe coming out of the 'T' goes to the steam generator on the other side of the corner cubicle.
Any help with this pipework would be highly appreciated.
Thanks..