J
jif
thought as my boiler and heating is comming up to 5yrs old and never had a problem would take out boiler and central heating cover with BG the enginner came out to inspect and has slaped a risk sticker on the boiler and the bathroom floor needs to come up and quoted over £600 + removal and refitting of floor to be able to be covered .
the safety advice is that the flue needs to be supportted and the prv pipe is copper for first meter then goes to main waste pipe in the extension to the main drain but the engineer says it needs to be cooper all the way and run under floor to outside roof (surley it is better the releif valve vents excees water to drain and not out on to roof ?)
the system as installed by a corgi registered engineer when the extension was done in 2007 .
he has then turned off the boiler by the electric's and left us with no heat or hot water all over christmas ,we have asked BG and all we got was there engineers right stuck as to where to go from here tried for second oppion but over the christmas period cannot get anyone
would it be ok to turn the water back on?
the safety advice is that the flue needs to be supportted and the prv pipe is copper for first meter then goes to main waste pipe in the extension to the main drain but the engineer says it needs to be cooper all the way and run under floor to outside roof (surley it is better the releif valve vents excees water to drain and not out on to roof ?)
the system as installed by a corgi registered engineer when the extension was done in 2007 .
he has then turned off the boiler by the electric's and left us with no heat or hot water all over christmas ,we have asked BG and all we got was there engineers right stuck as to where to go from here tried for second oppion but over the christmas period cannot get anyone
would it be ok to turn the water back on?