S
shajjad
I have a 13 bedroom B&B, and recently we had some extra bathrooms fitted which meant that extra pipe work internally and externally were completed. This meant that from 8 bathrooms to 13 were done. This also meant we had installed outside the soil pipes. There was also new hot & cold water connections as well as cold for the toilet were done.
So I need your advise on testing the pipe work and ensure everything is fine. What can be done? What are the processes?
So I need your advise on testing the pipe work and ensure everything is fine. What can be done? What are the processes?