S
SCB
Hello
I had a new extension and unfortunately the Heating Engineer adapted / converted the existing 15mm Copper pipework to 10mm PP, this was to provide the discreet finish etc, the subsequent installation of 2 new radiators was performed during December 2013 and I am still encountering a number of problems with the overall performance.
My Questions are:
Is there an industry regulation / standard / code of practice that states all new plastic pipework must be easily identified using appropriate foil tape ?
Is there an industry regulation / standard / code of practice that states all new plastic pipework installation must have a plan supplied to the homeowner by the Heating Engineer.
Any advice is appreciated.
Thanks
I had a new extension and unfortunately the Heating Engineer adapted / converted the existing 15mm Copper pipework to 10mm PP, this was to provide the discreet finish etc, the subsequent installation of 2 new radiators was performed during December 2013 and I am still encountering a number of problems with the overall performance.
My Questions are:
Is there an industry regulation / standard / code of practice that states all new plastic pipework must be easily identified using appropriate foil tape ?
Is there an industry regulation / standard / code of practice that states all new plastic pipework installation must have a plan supplied to the homeowner by the Heating Engineer.
Any advice is appreciated.
Thanks