L
leslie50
Hi
I am thinking of adding a new rad to my kitchen dinner,there is a rad in my hall and I was thinking of coming off of this,it would mean drilling a couple of holes and feeding the pipes through, the floor in the kitchen is concrete so the pipes would run on the surface which is not a problem .My c h is a gravity system ,my question would I have to drain down all the rads or would it be ok to close off all the rads and just drain what's in the pipes, also would it be ok just to turn of the boiler from the timer and turn down thermasat ,it just my boiler is very old and takes ages to relight ,I am due for a service but not for a few weeks, and next weekend I have some time on my hands.
Regards
I am thinking of adding a new rad to my kitchen dinner,there is a rad in my hall and I was thinking of coming off of this,it would mean drilling a couple of holes and feeding the pipes through, the floor in the kitchen is concrete so the pipes would run on the surface which is not a problem .My c h is a gravity system ,my question would I have to drain down all the rads or would it be ok to close off all the rads and just drain what's in the pipes, also would it be ok just to turn of the boiler from the timer and turn down thermasat ,it just my boiler is very old and takes ages to relight ,I am due for a service but not for a few weeks, and next weekend I have some time on my hands.
Regards