Hi all,
I'm David, long time lurker of the forum so thought about time I joined . I did my training many years ago (not gas safe) worked for myself for a few years then ended up in a completely different career direction. I enjoyed the work though and what I picked up has come in handy many times since.
I am in the process of getting an extension designed and whilst I'll have a builder doing the bulk of the work I'm also hoping to get involved in a fair bit of it once the shell is complete.
I am just doing a plan for the plumbing at the moment and one thing I'd like to incorporate is a gas outlet by the patio for a future outdoor kitchen. The builder uses a gas safe engineer who will be moving the boiler to the new utility room etc, however I didn't think about this initially but would make sense to have him do this work at the same time, if it's possible.
I wanted to check the consensus on how it should be installed before I ask and commit to the work being done, hence the post!
The run would be from the utility room, through the new extension then a couple of meters to the patio. I reckon it's 10-11m in total.
Could it be terminated to a outlet which would allow for other appliances (such as a patio heater) to be connected along with a NG BBQ?
Although I can source a NG BBQ I can't seem to find much information UK specific, it's mainly US.
Any advice appreciated.
I'm David, long time lurker of the forum so thought about time I joined . I did my training many years ago (not gas safe) worked for myself for a few years then ended up in a completely different career direction. I enjoyed the work though and what I picked up has come in handy many times since.
I am in the process of getting an extension designed and whilst I'll have a builder doing the bulk of the work I'm also hoping to get involved in a fair bit of it once the shell is complete.
I am just doing a plan for the plumbing at the moment and one thing I'd like to incorporate is a gas outlet by the patio for a future outdoor kitchen. The builder uses a gas safe engineer who will be moving the boiler to the new utility room etc, however I didn't think about this initially but would make sense to have him do this work at the same time, if it's possible.
I wanted to check the consensus on how it should be installed before I ask and commit to the work being done, hence the post!
The run would be from the utility room, through the new extension then a couple of meters to the patio. I reckon it's 10-11m in total.
Could it be terminated to a outlet which would allow for other appliances (such as a patio heater) to be connected along with a NG BBQ?
Although I can source a NG BBQ I can't seem to find much information UK specific, it's mainly US.
Any advice appreciated.