Hello
This is my first post so please bear with me.
I'm having a new build and got the point of plumbing for bathrooms. My issue is availability of plumbers(current plumbing cant do it now'arrgh) who can carry the work out in reasonable time frame for me. I've tried several' Im looking at months delay!
I need to connect two bathrooms to one outside foul pipe on one end of the building . One bathroom is on the outside wall the other more central to the building. My plan is to run a horizontal 110 mm foul pipe with a fall of 1:100 drop between the posi-joists and plumb in the toilets with fitment like below.
I've done a sketch to show layout
My question/s is can I attach the bath and sink outlets from the central bathroom to the right hand section of pipe?
Is this permitted with building regs. I cant seem to find anything saying I cant do it. I thought I'd ask for best method/practice
This will be the end of the run on the central bathroom. I was going to cap off the end solvent weld cap. With the fall being shallow I thought this would aid flushing of the foul pipe when bath empties or bathroom sink is run
This is my first post so please bear with me.
I'm having a new build and got the point of plumbing for bathrooms. My issue is availability of plumbers(current plumbing cant do it now'arrgh) who can carry the work out in reasonable time frame for me. I've tried several' Im looking at months delay!
I need to connect two bathrooms to one outside foul pipe on one end of the building . One bathroom is on the outside wall the other more central to the building. My plan is to run a horizontal 110 mm foul pipe with a fall of 1:100 drop between the posi-joists and plumb in the toilets with fitment like below.
I've done a sketch to show layout
My question/s is can I attach the bath and sink outlets from the central bathroom to the right hand section of pipe?
Is this permitted with building regs. I cant seem to find anything saying I cant do it. I thought I'd ask for best method/practice
This will be the end of the run on the central bathroom. I was going to cap off the end solvent weld cap. With the fall being shallow I thought this would aid flushing of the foul pipe when bath empties or bathroom sink is run