K
kevcrane
Hi everyone
Im draining down an unvented stystem on the first floor, but I can't see the filling loop anywhere, or where one would attach. Surely it needs to be pressurised to 1.4bar, but how???
Im draining down an unvented stystem on the first floor, but I can't see the filling loop anywhere, or where one would attach. Surely it needs to be pressurised to 1.4bar, but how???