Bit late as we are half way through 😩 but just wondering if I’ve had my pants taken down or this is reasonable (well the norm with supply and demand of work at present) All was ok until I got talking to a few lads at work and they thought it was excessively steep. Struggled getting quotes as everyone seems insanely busy and our builder kept being delayed on previous job due to material issues couldnt give an exact start date. This I think put most people off. So Just for my piece of mind/ sanity how does this look?
Supply and install radiators and valves included ,all 600mm tall
1.4 x single X1
1.4x double x 1
1.2 xdouble X1
1.2 x p plus X4
800mm X1
900mmx1
Total cost parts and labour £1680
Supply and install shower stack to bathroom, shower room and ensuite
Parts and labour £650
First and second fix to bathroom, shower room and ensuite and first fix kitchen only
£5000-no tiling and no white goods included
Supply and install 210l unvented cylinder
Move boiler into adjacent room(keep existing boiler)
Remove existing tanks
Connect up central heating and stat
First and second fix utility
£2650
Supply and install radiators and valves included ,all 600mm tall
1.4 x single X1
1.4x double x 1
1.2 xdouble X1
1.2 x p plus X4
800mm X1
900mmx1
Total cost parts and labour £1680
Supply and install shower stack to bathroom, shower room and ensuite
Parts and labour £650
First and second fix to bathroom, shower room and ensuite and first fix kitchen only
£5000-no tiling and no white goods included
Supply and install 210l unvented cylinder
Move boiler into adjacent room(keep existing boiler)
Remove existing tanks
Connect up central heating and stat
First and second fix utility
£2650