I had a plumber start the renovation of my bathroom but he had to be dropped off the job for making several mistakes.
He has fitted the bath and loo, but not the shower nor the basin. He has done the pipework for the shower. Chased the wall out and used 15mm copper pipework. Wall has been tiled, leaving the two pipes exposed to fit the thermostatic shower bar valve. The pipes are 15mm, and the shower valve is 22mm feed, so there will need to be reducing valves used; this is fine.
The challenge now is that the pipe centres are 160mm but the shower valve is 150mm. He's obviously mis-measured. Tiles are done. My father and I are attempting to finish the job, but not sure what can be done to remedy this mistake and compensate for the extra 10mm. There is some give, but not a lot.
Any advice that doesn't involve smashing the tiles!?
Thanks
Betz
He has fitted the bath and loo, but not the shower nor the basin. He has done the pipework for the shower. Chased the wall out and used 15mm copper pipework. Wall has been tiled, leaving the two pipes exposed to fit the thermostatic shower bar valve. The pipes are 15mm, and the shower valve is 22mm feed, so there will need to be reducing valves used; this is fine.
The challenge now is that the pipe centres are 160mm but the shower valve is 150mm. He's obviously mis-measured. Tiles are done. My father and I are attempting to finish the job, but not sure what can be done to remedy this mistake and compensate for the extra 10mm. There is some give, but not a lot.
Any advice that doesn't involve smashing the tiles!?
Thanks
Betz