M
Masood
Afternoon all,
Please can someone help me out by posting a screen grab or link to pipe sizing charts for copper and barrel beyond the standard 30m of 28mm given in the Viper manual. Or the equation for calculating pressure drop given heat input / flow rate required. I need the data for 35mm copper and 1" or 1 1/4" barrel.
I have the method for calculating TIV so will know if I'm heading beyond Domestic limits. If I find myself going over I'll get a Commercial engineer in to help. Just need pipe sizes right now to price up the job. Both are domestic jobs but long gas runs from meter to appliances.
I'm on hols at the mo and have no access to reference books, only the Viper manual and need to do a couple of quotes, hence the request.
If it helps, I need the following:
1)
24KW / 2.5m3/h
32m effective length, initial 22m (effective) must be barrel.
2)
34KW / 3.53m3/h
38.7m effective length, initial 6m must be barrel
Thanks in advance,
Masood
Please can someone help me out by posting a screen grab or link to pipe sizing charts for copper and barrel beyond the standard 30m of 28mm given in the Viper manual. Or the equation for calculating pressure drop given heat input / flow rate required. I need the data for 35mm copper and 1" or 1 1/4" barrel.
I have the method for calculating TIV so will know if I'm heading beyond Domestic limits. If I find myself going over I'll get a Commercial engineer in to help. Just need pipe sizes right now to price up the job. Both are domestic jobs but long gas runs from meter to appliances.
I'm on hols at the mo and have no access to reference books, only the Viper manual and need to do a couple of quotes, hence the request.
If it helps, I need the following:
1)
24KW / 2.5m3/h
32m effective length, initial 22m (effective) must be barrel.
2)
34KW / 3.53m3/h
38.7m effective length, initial 6m must be barrel
Thanks in advance,
Masood