Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Pipe under screed floor. in the Plumbing Jobs | The Job-board area at Plumbers Forums

Messages
6
I am not a plumber. My friend had a conservatory built and they extended her central heating but buried the flow and return pipe under the floor. There is only one flow and return pipe feeding 2 radiators so I assume they have split the pipes under the screed to feed both rads.My understanding is that the pipe should be continuous and should be housed in another pipe so it can be removed if there are any problems. Also connectors should not be buried. I am considering telling them to rip up the floor and do it correctly unless someone tells me that this is acceptable. Any help and pointers to any building regs etc would be appreciated. P1010714.JPGP1010715.JPGP1010716.JPG
 
You can’t necessarily say it’s been done wrong but it hasn’t been done well either from what I can see. There is nothing wrong with putting fittings for water/heating pipes under the screed. Compression fittings for gas under the screed is not allowed and this is maybe what you’ve heared. The pipes should ideally be lagged.
 
Does it come under Water supply Regulations
Schedule 2: paragraph 7?
No water fitting shall be embedded in any wall or solid floor’

This requirement applies to water fittings in a building which are supplied with mains water. It does not however apply to closed circuit systems specifically designed to be embedded in a solid floor such as underfloor heating systems or manifold systems for wet radiators, which may be embedded provided that:

  • the pipework is laid as a continuous loop without joints; and

  • all connections are above floor level and accessible; and

  • all materials are suitable for such installations: copper pipework

    would be required to be protected for example by means of a plastic coating.
 
Not quite sure what you mean SimonG.
Should it have its own thermostat and what is its own zone? Is it a separate system?
Just after a bit of advice really from the professionals.
 
Picture 2 shows a Tee at the bottom of the tail up to the rad, so if the other tail also has a tee there probably aren't any joints under the rest of the floor, just under the rads.
 
Not quite sure what you mean SimonG.
Should it have its own thermostat and what is its own zone? Is it a separate system?
Just after a bit of advice really from the professionals.
Dig deeper my friend you will find the answer and no it's not good practice to screed over pipework with push fit fittings attached. Cheers kop
 
Where I live we are allowed to bury couplings, and I think we can even bury fittings for heat pipes. That said you will almost never see a legitimate heating journeyman do so. With pex pipe there really isnt a need to as it is flexible and cheap. We always cover our pipes with insulation if they are to be in concrete except for radiant systems.
 
Where I live we are allowed to bury couplings, and I think we can even bury fittings for heat pipes. That said you will almost never see a legitimate heating journeyman do so. With pex pipe there really isnt a need to as it is flexible and cheap. We always cover our pipes with insulation if they are to be in concrete except for radiant systems.
you from the US ?
 
When you guys do radiant, how often do the builders put nails/screws through it? We had one job, pex in climate panels. The guys putting the hardwood floor down put 7 nails through the radiant in just one room.

Usually we put 90psi of air on the pex when we know they will be workig above it. This way they know when they hit it and can mark it for us to fix.
 

Similar plumbing topics

Thanks for the advice!
Replies
2
Views
608
  • Question
Thanks for this. The plumber is gas safe...
Replies
17
Views
4K
  • Question
Hello, I am just catching up on some threads...
Replies
1
Views
551
  • Question
No
Replies
9
Views
628
Thanks for letting us know.
Replies
8
Views
2K
Back
Top